Building a Light Alloyed Fixed Bridge in the Disaster Area
Date of Issue: 22.08.2021
The 5th Corps Regimental Command built a Light Alloyed Fixed Bridge in Sinop/Ayancık instead of the collapsed bridge due to flood, and opened it to pedestrian and vehicular traffic on 17 August 2021.